A Guide to FRS 102 for UK Architecture and Design Firms
24 November 2026
Architecture and design firms often have accounting arrangements that are more complex than their project list suggests. Fees may be earned across several design stages, contracts can change after work begins, consultants may be engaged on behalf of clients, and studios frequently operate from leased premises.
Those issues make the latest changes to FRS 102 particularly relevant. Most amendments from the Periodic Review 2024 apply to accounting periods beginning on or after January 1, 2026, with significant changes to revenue recognition and lease accounting.
Understand Where FRS 102 Applies
FRS 102 is the main UK and Republic of Ireland financial reporting standard for entities that do not apply adopted IFRS, FRS 101, or FRS 105.
Architecture practices applying the standard need accounting policies that reflect the substance of their contracts rather than simply when invoices are issued or cash is received.
The latest FRS102 changes are particularly important for firms with multi-stage client contracts or significant lease commitments because both areas now require closer analysis.
Finance teams should review existing accounting policies before the first affected year-end rather than treating the changes as a final-accounts exercise.
Review How Project Revenue Is Recognized
Revised Section 23 introduces a five-step revenue model based on the principles of IFRS 15.
The Financial Reporting Council explains that revenue is now recognized when, or as, control of promised goods or services transfers to the customer. The new framework applies a consistent model across contracts with customers. The FRC provides further detail in its FRS 102 guidance and factsheets.
For an architecture practice, that means examining the actual promises made in an appointment rather than recognizing revenue purely because a design stage has been invoiced.
Work Through the Contract Structure
The five-step process requires firms to:
- Identify the contract with the client
- Identify separate performance obligations
- Determine the transaction price
- Allocate the price to those obligations
- Recognize revenue as each obligation is satisfied
A contract covering concept design, planning, technical design, and construction-stage services may require analysis of whether those activities are separate obligations or part of one combined service.
The answer depends on the contract, not simply the RIBA stage labels used internally.
Pay Attention to Revenue Recognized Over Time
Many architectural services are delivered gradually rather than at one point.
Where the requirements for over-time recognition are met, firms need an appropriate method for measuring progress. That could involve outputs achieved, milestones, or inputs such as costs or labor hours where they faithfully represent performance.
Timesheets therefore become more than a resource-management tool. Poor time recording can undermine revenue calculations if hours are used to measure progress.
Project managers and finance teams should also agree how to treat rework, inefficiencies, or costs that do not reflect genuine progress.
Billing remains a separate issue. A client may be invoiced in advance or in arrears, so amounts billed will not necessarily equal revenue recognized in the same period.
Control Variations and Additional Services
Architecture contracts frequently change.
Clients request redesigns, planning requirements alter the scope, projects pause, or additional services are added after the original appointment.
Under the revised revenue model, firms need to assess contract modifications rather than automatically adding every variation to existing revenue calculations.
Keep clear records of:
- The original agreed scope
- Approved variations
- Additional fee agreements
- Changes in expected project value
- Revised completion estimates
- Disputed or uncertain amounts
Do not recognize additional revenue simply because the project team expects the client to approve a fee later.
Commercial teams and finance need a consistent process for deciding when variations become enforceable additions to the contract.
Bring Most Lessee Arrangements Onto the Balance Sheet
The other major change affects firms leasing studios, offices, vehicles, or other assets.
Under revised Section 20, the previous operating and finance lease distinction has largely disappeared for lessees. Most leases now result in recognition of a right-of-use asset and lease liability.
Short-term and qualifying low-value leases can remain outside the main model where the relevant exemption is used.
For an architecture practice with a long studio lease, this can materially change the balance sheet even though the rental payments themselves have not changed.
Instead of recording a simple operating lease expense, the accounts may now include depreciation of the right-of-use asset and interest on the lease liability.
Gather Lease Data Before Year-End
Implementing the new lease requirements depends heavily on contract data.
Finance teams should identify all arrangements that may contain a lease, including property agreements and equipment contracts that may not previously have received much accounting attention.
For each relevant agreement, collect:
- Commencement and expiry dates
- Rental payment schedules
- Rent-free periods and incentives
- Break and extension options
- Variable payments
- Existing lease balances
Determining the lease term can require judgment, especially where the firm has options to extend or terminate an agreement.
A Glasgow studio that has occupied the same premises for years, for example, may need careful assessment of whether extension options are reasonably certain to be exercised.
Check the Effect on Performance Measures
The accounting changes can affect more than statutory financial statements.
The FRC notes that bringing additional leases onto the balance sheet may change measures such as gearing, interest cover, current ratios, and EBITDA.
Architecture firms with bank facilities or other financing arrangements should therefore review covenant definitions before reporting under the revised standard.
Management reporting may also need adjustment. EBITDA can increase when operating lease expense is replaced by depreciation and interest, even though the underlying rent payment remains.
Directors need to distinguish accounting changes from genuine improvements in operating performance.
Prepare Project and Finance Teams Together
FRS 102 implementation should not sit entirely with the accountant.
Project directors understand scope changes, client approvals, progress, and consultant arrangements. Finance understands recognition requirements, balance-sheet treatment, and reporting.
Both sides need consistent information.
Architecture firms should review project templates, fee schedules, time-recording systems, variation procedures, and lease records so that the necessary data is available throughout the year.
The revised FRS 102 does not change how a practice designs buildings or serves clients. It does change how some of those commercial arrangements appear in the accounts.
Firms that map their contracts, tighten project data, and review leases early will be in a much stronger position than those attempting to reconstruct the information at year-end.
Comments on this guide to FRS 102 for UK architecture and design firms article are welcome.
Buildings
Key Buildings in Scotland Articles
Historic Glasgow : best Glasgow architecture of the past
Comments / photos for the FRS 102 for UK architecture and design firms advice page welcome.